All scenarios

Process quoting from engineering packs

PCB Process Quote Preparation

Combine customer BOMs, board-house data, and trial-run process requirements into a standard process-quote sheet, with missing parameters left pending for review.

Published ClawX Enterprise AI Editorial Team
PCB productionProcess quotingParameter extractionEnterprise AI implementationIntelligent transformationAI in manufacturing
01

Solution overview

This case covers the common PCB process-quoting workflow. Quoting and engineering teams hand the customer BOM, board-house production data, and trial-run process requirements to ClawX for unified preparation.

ClawX extracts board size, thickness, mount sides, material counts, test, and packaging requirements into the quote sheet. Content that is not explicitly stated remains “pending confirmation” and is never guessed.

Business scenario
Prepare PCB process-quote materials, determine required process steps, fill quote parameters, and retain sources plus pending items.
Channels and systems
ClawX + customer BOM + board-house production data + process-requirement notes + result summary.
Current workload
A single process-quote preparation typically takes about 8 person-hours of cross-checking multiple files and filling the template.
Execution frequency
Executed per mass-production or trial-run process quote.
Outcome after adoption
Automatically prepare quote data, process parameters, and a pending-confirmation list for quoting and engineering review.
02

Acceptance metrics: before vs. after

BeforeAfter
Material preparationOpen the BOM, board-house file, and process requirements separatelyAutomatically consolidate key information from the BOM, board-house data, and trial-run requirements.
Product parametersSearch board size, thickness, and related fields manuallyWrite observed parameters such as board length 122.7, width 37.9, and thickness 2.402.
Process-step determinationEngineers judge each process step item by itemAutomatically identify programming, labeling, SMT, depaneling, test, visual inspection, and packaging.
Pending confirmationMissing items are easy to skip in verbal handoffsPanel size, units per panel, and depaneling connection method stay pending and are written into the notes.
03

Customer background and business challenge

Enterprise type

PCB and electronics manufacturers that must complete process quoting quickly before mass production or trial runs.

Business department

Quoting, engineering, manufacturing, test, and project-management teams participate jointly.

Knowledge sources

BOMs, board-house production data, trial-run process requirements, standard quote sheets, and test/packaging rules.

Current pain point

PCB process quoting requires checking the BOM, board-house data, and process requirements together. Missing panel size, units-per-panel, and depaneling connection details must not be guessed—they must be marked pending confirmation.

04

Implementation panorama

Before · SOP

  1. 1Collect the customer BOM
  2. 2Inspect board-house production data manually
  3. 3Open process-requirement materials
  4. 4Judge process steps manually
  5. 5Fill the quote template manually
  6. 6Write pending items separately

After · SOP

  1. 1Upload the three input classes
  2. 2ClawX organizes information sources
  3. 3Write the standard quote sheet automatically
  4. 4Preserve formulas and images in the workbook
  5. 5Output process-quote data
  6. 6Generate pending-confirmation notes
05

Real-world workflow

1

Collect materials

Collect the BOM, board-house production data, and trial-run process requirements.

2

Prepare parameters

Read board size, thickness, mount-side count, and material quantities.

3

Determine process steps

Determine whether programming, labeling, testing, packaging, and related steps are required.

4

Fill the workbook

Preserve existing formulas, images, and styling while filling values.

5

Review and deliver

Output data sources and pending-confirmation items.

06

Implementation results and value data

Observed run totals: 53 valid material types, 2 mount sides, 405 SMT pieces, and 3 critical pending-confirmation items.

BeforeAfter
Process-quote preparation timeAbout 8 person-hours per projectAbout 15–25 minutes per run; multiple projects can run in parallel
Valid material typesCounted manually across the BOM53 valid material types summarized automatically
Mount sidesConfirmed by inspecting drawings and notes2 mount sides written from source evidence
SMT piece countAggregated manually from multiple columns405 SMT pieces summarized automatically
Critical pending itemsEasy to omit during verbal handoff3 critical pending items retained in the notes
Human involvementCross-check every file and fill the full templatePeople focus on review and decision-making for pending items
07

Before-and-after comparison

Before

Engineers manually search multiple project files, judge information sources, and fill the standard workbook. A single project typically takes about 8 person-hours, and it is difficult to handle multiple projects at the same time.

After

ClawX consolidates materials, prepares reliable information, and marks pending items. A single run takes about 15–25 minutes; multiple projects can be processed in parallel, and people mainly review and decide.

08

Delivered value

Cross-document parameter extraction

Pull board size, thickness, mount sides, and material counts from multiple sources.

Process-step identification

Identify programming, labeling, SMT, depaneling, test, inspection, and packaging steps.

No-guess pending policy

Keep panelization gaps pending instead of inventing values.

Template integrity

Preserve formulas, images, and styling in the standard quote workbook.

Review-ready delivery

Deliver quote data together with sources and a confirmation list.

09

Observed pending-confirmation items

These panelization fields lacked explicit evidence in the source pack and remain human-owned.

Panel size

Panel dimensions were not explicitly stated and remain pending confirmation.

Units per panel

Units per panel were not explicitly stated and remain pending confirmation.

Depaneling connection method

The depaneling connection method was not explicitly stated and remains pending confirmation.

More enterprise scenarios

More enterprise scenarios

Have a similar workflow?

ClawX turns existing SOPs, spreadsheets, business systems, and human approvals into a controlled AI workflow.